Notice #13202597 · 2026 Infra-33 · legacy record

Installation of primary metering and secondary distribution line for (GAQTC Building, GAQTC Building pump house, Bahay Pag-asa old and New building, FTC Building and Legislative Building), (Supply , I

Province of Lanao Del Norte

28,088,979
closes in 12h 28mclosing Sep 17, 2026 · 10:00 AMpublished Aug 20, 2026delivery 100 days

Scope

show the full notice text

PARTICULARS DATE Pre-bid Conference @ Gov’s Conference room,3rd floor, Capitol Building, Pigcarangan, Tubod, LDN September 03, 2026 @ 10AM Deadline for Submission of Eligibility requirements and bidding documents for bid opening (all bids must be placed in a sealed envelope) @ VIP Room, 3rd floor, New Capitol Building, Pigcarangan, Tubod, LDN. September 17, 2026 @ 10AM Post Qualification September 23, 2026 @ 10AM Bid doc fee of Php 25,000.00 For any inquiry, please call BAC Secretariat, Telephone No. 063-341-5623. Bid documents are downloadable @ Phil-Geps website valid upon receipt of non-refundable fee as stated above. This bidding shall be governed by the Implementing Rules and Regulation of Republic Act. No.9184, otherwise known as the ´Government Procurement Reform Act”. The Province of Lanao Del Norte reserves the right to accept or reject any or all bids, and waive any formality or technicality, and to award to any bidder whose proposal is deemed most advantageous to the Provincial Government of Lanao Del Norte. The Provincial Government of Lanao Del Norte neither assumes any obligation for any loss whatsoever that may be incurred by the bidder in the preparation of their respective bids nor does the Provincial Government of Lanao Del Norte guarantee that an award will be made. (Sgd) Engr. MARIETTA L. BORILLO Provincial Engineer/ BAC – Chairperson

Requirements

show the 10 standard requirements

confirm these in the bid documents

  • PhilGEPS Certificate of Platinum Registration (Annex A eligibility documents current)IRR §8.5.2
  • Registration certificate — SEC, DTI, or CDAIRR §23.1
  • Valid Mayor's / business permitIRR §23.1
  • Tax clearanceEO 398
  • Statement of ongoing contracts + single largest completed similar contract (SLCC) ≥ 50% of the ABCIRR §23.1
  • Audited financial statements, stamped received by BIRIRR §23.1
  • Net Financial Contracting Capacity (NFCC) ≥ ABCIRR §23.1
  • Omnibus Sworn Statement, notarizedIRR §25.3
  • Bid security: 2% cash/cashier's check, 5% surety bond, or bid-securing declarationIRR §27.2
  • Valid PCAB contractor's license, category matching the ABCRA 4566

Similar recent awards

  • Sarex Builders and Supply(Cotabato)

    won ₱47,662,779.51 — 99.6% of the ₱47,813,220 budget · 19-Aug-2026

    26MI0078 - Road Widening Along Bukidnon-cotabato Rd - K1627 + 175 - K1627 + 975

  • M.s.d.l.r. Construction(Zamboanga Sibugay)

    won ₱9,446,292.16 — 99.9% of the ₱9,454,060 budget · 19-Aug-2026

    26JF0038 - Concreting of Road Sta. 0+000 to Sta. 0+574, Barangay Goodyear, Kabasalan, Zamboanga Sibugay

  • Eg-vryle Construction & Enterprises(Zamboanga Sibugay)

    won ₱9,439,032.41 — 99.8% of the ₱9,454,060 budget · 19-Aug-2026

    26JF0059 - Construction of Access Road Sta. 0+000 to Sta. 0+574- Barangay Lower Taway, Ipil, Zamboanga Sibugay

  • Panying Aml Construction(Zamboanga Sibugay)

    won ₱11,906,438.42 — 99.7% of the ₱11,940,000 budget · 19-Aug-2026

    25JF0070 - Completion/Upgrading/Repair and Equipping of RHU/SHC, Ipil Rural Health Unit, Zamboanga Sibugay

  • Infinitum 888 Construction and Development Corporation(Isabela)

    won ₱9,315,848.95 — 97% of the ₱9,603,972.07 budget · 19-Aug-2026

    26BG0046:CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Publi

Contact

JEOLITO DUMASIG Buyer II Pigcarangan Tubod Tubod Lanao Del Norte Philippines 9209

63-0-3415623 63-0-3415345

hermaseruela@yahoo.com.ph

From the bid documents

checking for enriched data…

Can we count how the site gets used? No ads, no third-party trackers, and never your searches or saved lists — just which pages and features get used. What we collect