Notice #38958

Consulting Services for the Project Implementation Consultant (PIC) for the Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools - PIC 1 under IBRD Loan No. 97040-PH: Infrastructure for Safer and Resilient Schools (ISRS) Project

Department of Public Works and Highways - Main

ABC —
closes in 11h 59mclosing Sep 17, 2026 · 9:00 AMpublished Jun 23, 2026
International Competitive Bidding - OthersConsulting Servicesconsulting

Scope

Technical validation, school design, and construction supervision for Luzon schools.

show the full notice text

REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services for the Project Implementation Consultant (PIC) for the Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools – PIC 1 under IBRD Loan No. 97040-PH: Infrastructure for Safer and Resilient Schools (ISRS) Project Country: Philippines Name of Project: Infrastructure for Safer and Resilient Schools (ISRS) Project Loan No.: IBRD Loan No. 97040-PH Assignment Title: Contract ID No. 26CSZ005, Consulting Services for the Project Implementation Consultant (PIC) for the Technical Validation, Detailed Architectural and Engineering Design, and Construction Supervision of Luzon Schools – PIC 1 under IBRD Loan No. 97040-PH: Infrastructure for Safer and Resilient Schools (ISRS) Project Reference No .: PH-DPWH-CS-PIC1-RFP The Republic of the Philippines (hereinafter called ”Borrower”) has received financing from the World Bank (the “Bank”) toward the cost of the Infrastructure for Safer and Resilient Schools (ISRS) Project, and intends to apply part of the proceeds for consulting services for the Project Implementation of the ISRS project. The consulting services (“the Services”) being procured via this REOI includes the following summary of the key responsibilities expected under these Services: The consulting services are structured into two key phases: the Detailed Architectural and Engineering Design (DAED) Phase and the Construction Supervision (CS) Phase. These phases collectively cover the progression of the project from the development of complete, buildable design solutions to the actual implementation and delivery of the works. The Detailed Architectural and Engineering Design (DAED) Phase covers the full development of technical solutions for the project, starting from validation of site conditions up to the preparation of complete, procurement-ready design documents. This phase ensures that all interventions are technically sound, climate-resilient, and compliant with environmental and social safeguards, ultimately enabling smooth transition to procurement and construction. Inception and Planning Technical Validation and Assessment Outputs Environmental and Social Safeguards Deliverables Detailed Architectural and Engineering Design (DAED) Procurement Support and Bidding Documents Progress Monitoring and Reporting The Construction Supervision (CS) Phase focuses on ensuring that the approved designs are implemented correctly, efficiently, and in compliance with all technical, environmental, and contractual requirements. During this phase, the Consultant acts as the Client’s representative in overseeing construction, maintaining quality control, and ensuring that the completed works meet the intended standards prior to turnover. Pre-Construction Supervision Construction Monitoring and Supervision Reports Environmental, Social, Health, and Safety (ESHS) Compliance Monitoring Quality Control and Technical Support Outputs Completion, Acceptance, and Turnover Deliverables Defects Liability and Close-Out Reports The detailed Terms of Reference (TOR) can be access through this link: https://drive.google.com/drive/folders/19csDthvYbQsTt-LV5lEyMn7j56wcvhlh The type of Contract will be Lump-sum and Time-based and the Contract Duration will be 36 months .

Requirements

show the 3 standard requirements

confirm these in the bid documents

  • PhilGEPS registrationIRR §8.5.2
  • Eligibility documents as listed in the bid documentsRA 9184
  • Omnibus Sworn Statement, notarizedIRR §25.3

Contact

Mikaela Benoza

From the bid documents

checking for enriched data…

Can we count how the site gets used? No ads, no third-party trackers, and never your searches or saved lists — just which pages and features get used. What we collect